Need, quality, service — the three reasons behind any worthwhile purchase all point the same direction for C-IBP-2211 candidates: the SAP Certified Application Associate - SAP IBP for Supply Chain (2211) materials at GetValidTest exist because the exam is worth taking, and they are maintained because your result matters.
SAP C-IBP-2211 Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| Configuration and Data Integration | - Integration with SAP S/4HANA and other systems - Master data setup in SAP IBP |
| Supply Planning and Response Management | - Supply matching and constraints handling - Supply planning algorithms |
| Inventory Optimization | - Inventory targets and safety stock planning |
| Sales and Operations Planning (S&OP) | - Consensus demand and supply balancing - S&OP process integration |
| Analytics and Reporting | - Planning dashboards and reporting capabilities - Key figures and analytics tools |
| Overview of SAP Integrated Business Planning (IBP) | - SAP IBP architecture and components - Key concepts and planning processes |
| Demand Planning | - Statistical forecasting - Demand sensing and adjustment processes |
C-IBP-2211 Exam Facts and the Service Behind Them
- Supply Planning and Response Management ()
- Demand Planning ()
- Inventory Optimization ()
SAP Certified Application Associate - SAP IBP for Supply Chain (2211) Sample Questions:
Which of the following approaches could you take to reduce run times of an optimizer?Note: There are 3 correct answers to this question.
- A. Avoid using telescopic time buckets.
- B. Increase the use of incremental lot size beyond the frozen horizon.
- C. Keep the number of fairshare segments small.
- D. Use non-overlapping networks by using subnetwork ID maintained at Location-Products to reduce the size of the problem.
- E. Split into multiple planning areas to support weekly vs. daily planning needs.
Correct Answer: A,D,E 🗳️
Model configuration allows the attributes of a master data type to be assigned as key figures.Which features are relevant for this type of object?
- A. This type of key figure is not usually stored and it cannot be set to editable.
- B. This object contains user-defined criteria that monitor the running of business plans.
- C. This object is not exposed to the user in planning views or modeling.
- D. This object provides a single value for a unique planning combination.
Correct Answer: D 🗳️
Which of the following are features of lag-based snapshots?Note: There are 2 correct answers to this question.
- A. Target key figures for these snapshots are exposed to the user in planning views.
- B. Target key figures for these snapshots must have lag as a root attribute in its base planning level.
- C. The number of lag-based snapshots are limited to nine levels.
- D. Lag-based snapshots are created in the Configuration app for a fixed time range.
Correct Answer: B,D 🗳️
The S&OP Operator Profiles app is used to configure different types of algorithms.Which algorithm-specific settings are unique for only the Time Series-based Supply Optimizer?Note: There are 2 correct answers to this question.
- A. Processing mode
- B. Global cost factors
- C. Time profile level
- D. Discretization
Correct Answer: A,B 🗳️
What are some of the available ABC segmentation methods in SAP IBP?Note: There are 2 correct answers to this question.
- A. By Number of Items (Sorted Average)
- B. By Number of Items (Sorted Values)
- C. By Pareto Principle (Sorted and Calculated Values)
- D. By Pareto Principle (Sorted and Cumulated %)
Correct Answer: B,C 🗳️
Viewing page 1 out of 16 pages.
Viewing questions 1-5 out of 80 questions.


